It will be necessary to close Crouch Lane, Selling from 25th October 2021 for up to 21 days.
The road will be closed 10 metres either side of both railway bridges.
The alternative route is via Crouch Lane, South Street, Fox Lane and Selling Road.
If Fox Lane is flooded, an alternative route will be signed.
This is to enable railway footbridge repairs to be carried out by Network Rail.
Enclosed is a copy of the Traffic Notice in confirmation of this.